Woolworths has enabled a new electric vehicle (ev) loading in their faoiu faadow in the new, operational galles at the beginning of 2025.
The carbon site four fastric loading plugs, increasing the total number of woolworths of Woolworths with Eval load installations to 24 to Australia.
This expansion provides additional load options for ev driver and integrate with the cargo network.
The site is available on the plughare and pole 2 x authe-CCS2 the fast charges are located under the woolworth canopy.
The site is 66 Princes Hwy, Faadow Faadow NSW 2519, Australia and may have more info on site to
The first load sessions were only 2 days ago.
The speed and costs of charges
The Meadow Fairy Station includes four speedy speeds, accessible because of the folder platform. While WOCHWORTHS has not released exact power assessment for this place, a comparison can be pulled by his site paramatted
The fairy meadow operates on a to-kilowatt-hour rate (kwh) through the credit carddox. To the site, you will pay $ 0.55 for KWH.

Woolworths load network ‘
Fairy Meadow site is the 24th Woolworths supermarket to offer eviction. The society’s network began to À ounces in the north way as the parammeta places, and now includes another sites such as Kirrawe
These stations, all connected to charging ach of chars and DC and DC’s releases allowing customers to charge their vehicles as your shopping.
Woochworth works more than 1,000 loads and sites ,, but growing the part of their imprint, support from cargo of jet and charges.
Four-charged addiction in Meadow faying the drivers evil in the region with a practical load option. Woolworths investment in the infrastructure EV with adoption increase in Australia vehicles in Australia and Leverages its the store to offer to the load in suitable places.